 Testing and Commissioning of BIPV Installations

Testing and Commissioning of BIPV Installations

All grid connected BIPV systems (installed in accordance with MS 1837:2005 by the Approved PV Service Providers - APVSPs) must be tested and commissioned prior to physical interconnection to the TNB distribution grid.

The “Testing and Commissioning (T&C)” covers a comprehensive series of tests to confirm that the installation functions as designed and in a safe and effective manner.

TNB shall be a witness to the “Testing and Commissioning (T&C)” and grid connection of BIPV installations by the PV Service Providers concerned.

The T&C form showing the tests to be conducted for the commissioning of the BIV installations is in the following links :

 

Provision of safety labels and manual

 

Pictures of PV system installation components



APVSP Login / Copyright / Disclaimer / Local & International Links / Sitemap
Locations of visitors to this page
Copyright 2017 MBIPV Project All Rights Reserved. Web design by www.e-globalfocus.com